If WSDOT is awarded the RAISE grant funds, the projects are expected to follow the timeline shown below.
RAISE project timeline with milestones
Seattle
- 2023
Determine final scope of work and launch. Begin community engagement, conceptual design & evaluation. - 2024
Develop conceptual design and cost estimate for community supported preferred option. Planning study complete. - 2025
Finalize Preliminary Engineering (30% design level).
Spokane
- 2025
Determine final scope of work and launch. - 2026
Community engagement to determine, evaluate, select and prepare cost estimates for 2-3 concepts. - 2027
Develop conceptual design and cost estimate for community supported preferred option. Planning study complete. - 2028
Finalize Preliminary Engineering (30% design level). - 2029
Continue design development and community engagement. - 2030
Continue design development and community engagement. - 2031
90% design expected complete.
Toolkit
- 2023
Determine initial scope of work and launch. Advance GIS framework. Develop/test Transportation Equity Lab. - 2024
Produce/test decision-making tools for critical activities. Hold Transportation Equity Lab, other workshops. - 2025
Refine toolkit scope of work. Hold Transportation Equity Lab. Continue to test/refine/train on toolkit. - 2026
Develop/test materials identified in updated scope of work. Hold Transportation Equity Lab. - 2027
Revise materials/trainings. Complete/disseminate case study examples via trainings. - 2028
Submit report on initial phases. - 2031
Submit final report.