Welcome!
Help shape the future of State Route 7 – Learn about and provide input on the proposed improvements for SR 7 between SR 507 to 99th Street South. Your input will help identify walking, bicycling and rolling improvements along the project corridor.
Google Translate is available on this page. To translate this page:
- Look for the dropdown menu at the top of the page that reads “Select Language”
- Click and select the language you prefer.
- The page will automatically change into your language.
- If you don't see the pop-up, right click anywhere on the page, click "Translate," and select the language you prefer.
WSDOT translated graphics and visuals on this page into Korean and Spanish.
Project overview
Every day, thousands of people rely on SR 7, also known as Pacific Avenue South, in Pierce County. SR 7 supports people who travel to work, school, recreation, and local businesses. It connects the communities of Spanaway, Parkland and Midland to the City of Tacoma and Joint Base Lewis-McChord. SR 7 also provides access to regional routes like SR 512 and SR 507.
The Washington State Department of Transportation is planning improvements to SR 7 between SR 507 and 99th Street South. This section will be repaved as part of WSDOT preservation program. WSDOT is also looking at ways to reduce fatal and serious injury crashes along SR 7 and make the corridor comfortable for all users.
This online open house shares existing conditions, introduces transportation improvements WSDOT is evaluating, and gives you an opportunity to provide feedback on potential improvements.
SR 7 between SR 507 and 99th Street South
Existing conditions
The project team reviewed existing conditions, transportation data and community feedback to better understand how the corridor is functioning today. Data helped inform potential opportunities for future transportation improvements as part of this preservation project.
The team reviewed the following:
- Driveways
- Environmental conditions
- Existing plans and projects
- Speed and crash data
- Sidewalks and bike lanes
- Traffic counts
- Transit service
WSDOT crash data
Between 2020 and 2024, there were 1,938 crashes along the SR 7 project corridor, including 62 crashes that resulted in fatality or serious injury.
Fatal and serious injury crashes by type:
- 26 vehicle crashes
- 20 pedestrian crashes
- 12 motorcycle crashes
- 4 bicycle crashes
Top contributing factors:
- Impaired driving
- Failure to yield right-of-way
Most common crash types:
- Same-direction sideswipe
- Pedestrian-involved crashes
The map shows where crashes occurred between 2020 and 2024. Warmer colors indicate areas with more crashes, and yellow circles mark locations of fatal or serious injury crashes
Data source: WSDOT Crash Data
Under 23 U.S. Code § 148 and 23 U.S. Code § 407, safety data, reports, surveys, schedules, lists, compiled or collected for the purpose of identifying, evaluating, or planning the safety enhancement of potential crash sites, hazardous roadway conditions, or railway-highway crossings are not subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location mentioned or addressed in such reports, surveys, schedules, lists, or data.
What we heard
During early outreach, community members, corridor users and project partners shared the following key takeaways:
- Heavy traffic and high speeds create mobility challenges along the SR 7 corridor.
- Missing sidewalks and crosswalks make walking and rolling uncomfortable and not accessible for all users.
- Many users rely heavily on transit to travel along SR 7.
Input from partner group and community members identified areas along SR 7 where improvements to safety, access and traffic management are needed:
- SR 704/176th Street South
- Military Road South/152nd Street East
- 112th Street South
- 99th Street South to 121st Street
- SR 512 interchange
Improving how people travel along SR 7
In addition to pavement preservation work, this project will identify opportunities to improve how people travel on and across the corridor. Proposed improvements will help to make walking, biking and rolling more comfortable while supporting travel for all users.
Since 2022, Washington law has required WSDOT highway projects to follow Complete Streets principles. This means designing state highways to reduce the potential for fatal and serious injury crashes, improve accessibility and comfort for all users and better connect state highways with local communities.
When developing potential improvements, the project team focused on these Complete Streets principles:
- Comfortable travel for all users
- Reduce the potential for fatal and serious injury crashes
- Improve access management to reduce conflicts at driveways and side streets
- Support future growth and travel needs
Intersection improvements
The project team selected seven intersections for more analysis based on existing vehicle operations, spacing constraints, and crash history involving people walking, biking and driving. Potential improvements to these intersections include roundabouts, lane configurations and improved pedestrian crossings.
These intersections will be reviewed to identify opportunities to improve mobility and access for all users
Existing cross section (typical)
Image shows the typical existing cross section of SR 7. The roadway is approximately 96 feet wide and fits within 100 feet of state right-of-way along most of the corridor
Most of SR 7 includes:
- 5-foot sidewalks
- Drainage ditches
- 5-foot bike lanes next to vehicle lanes
- Two vehicle lanes in each direction
- A center turn lane
- Bus pullouts at bus stops
Potential improvements
The following potential improvements show different ways SR 7 could be improved. They are organized into two categories:
- Active transportation options improve comfort, safety and connectivity for people walking, rolling, biking and accessing transit.
- Roadway options improve how vehicles move through the corridor while supporting comfortable crossings and access to destinations.
Additional improvements are also identified that can be combined with different active transportation and roadway options to improve safety, accessibility and corridor operations.
The potential improvements reflect community and agency priorities, including:
- Options to reduce the potential for fatal and serious injury crashes
- Comfort for people walking, rolling, biking, accessing transit and driving
- Access to transit and community destinations
- East-west connections and crossings
- Support for future growth and changing travel needs
- Balance for all travel modes and roadway operations
These potential improvements meet WSDOT Complete Streets requirements by improving connectivity and comfort for people who bike, walk, and roll. All proposed improvements will require further analysis. The final plan for SR 7 may use a combination of proposed improvements based on right-of-way needs, cost and construction feasibility.
Some improvements will be included throughout the corridor and are not shown in the cross-section examples below. Americans with Disabilities Act (ADA)-compliant ramps, detectable warning features and other accessibility improvements will be updated to meet current standards. Bus stop and other transit shelter spaces will also be incorporated in coordination with Pierce Transit. Instead of bus pullouts, buses will stop in the travel lane, helping to reduce travel time and conflicts between buses and people biking.
Active transportation options
The following options highlight different potential active transportations facilities for SR 7.
Buffered bike lane and separated sidewalk

This option is similar to the existing bike lane and adds a buffer with flexible posts or other vertical separation between people biking and vehicle traffic. Greenery would separate the bike lane and sidewalk.
Shared-use path

This option provides a wider dedicated path for people walking, biking and rolling. The path would be separated from the vehicle lanes by greenery. People walking, biking and rolling would share the path and travel in both directions.
Sidewalk-level bike lane and sidewalk

This option provides clearly marked spaces for people biking and people walking or rolling. This marking would reduce the number of conflicts between people biking and people walking or rolling. Bike lanes would be one-way, with southbound bike lanes on the west side of SR 7 and northbound bike lanes on the east side. The sidewalk and bike lane would be the same level and separated by a detectable strip for people using canes. Greenery would separate the sidewalk and bike lane from the roadway.
An example of a sidewalk-level bike lane with a cane detectable stripTwo-way bike lane and sidewalk

This option is similar to the sidewalk-level bike lane and sidewalk option but includes additional width to allow people biking to travel northbound or southbound on both sides of the road. The sidewalk and bike lane are separated by a cane detectable strip. The sidewalk and bike lane remain separated from the roadway by greenery.
Roadway options
The following roadway options highlight different potential lane configurations for SR 7.
Center turn lane

SR 7 currently has a center turn lane that allows people driving to turn left across oncoming traffic. This provides access to driveways and side streets. However, center turn lanes also create more points where vehicles can cross paths and that can increase the potential for fatal and serious injury crashes.
Median

A median separates traffic traveling in opposite directions. It reduces head-on and left-turn conflicts and can reduce the potential for fatal and serious injury crashes. Access to side streets and driveways on the other side of the road are provided by U-turns, roundabouts or left turns at controlled intersections to access the side street network. The median would be located between controlled intersections and would not replace left turns at signalized intersections or roundabouts.
Median and restricted turn lanes

This option is similar to a standard median but includes wider medians and left turn lanes at some locations. These turn lanes would provide access to side streets and major driveways.
Other proposed improvements
Based on community and partner feedback, the project team is considering additional potential improvements to supplement active transportation and roadway options at specific locations along SR 7.
Sidewalk-level driveway crossings
Many driveways along SR 7 require people walking and rolling to leave the sidewalk and cross at roadway level. Sidewalk-level driveway crossings keep the sidewalk flat across driveways. This can make walking and rolling more comfortable and encourage drivers to slow down when entering or leaving a driveway.
Example of a sidewalk-level driveway crossing. The sidewalk stays level while vehicles cross it to enter or leave a driveway
Raised crosswalks at roundabouts
Raised crosswalks at roundabouts help to encourage slower vehicle speeds and increase comfort for people walking and rolling.
Source: Jeramey Jannene/Urban Milwaukee. Example of a raised crosswalk shown across a speed hump
Queue jumps
Queue jumps allow buses to move ahead of other traffic at select intersections and reduce delays for people riding transit. A northbound queue jump is already in place at the 112th Street intersection.
Source: Wikimedia Commons. Example of a traffic signal with designated transit signal
Business access and transit lanes
This proposed improvement replaces a vehicle lane in each direction with lanes dedicated to buses and right turns to provide access to businesses and side streets. This improvement would be limited to locations where vehicle volumes allow fewer lanes and could reduce transit travel time.

Speed management
WSDOT is proposing to reduce the speed limit on SR 7 between SR 507 and 99th Street to 30 miles per hour (MPH) to give drivers more time to react to conflicts and reduce the potential for fatal and serious injury crashes. Along with the lower speed limits, WSDOT is working to make other changes that will encourage slower driving speeds.
Speed limit sign
Lighting
Lighting improves visibility and comfort during low-light and nighttime conditions. It helps people driving, walking, biking and rolling see each other.
AI-generated image. Example of pedestrian lighting providing higher visibility in low light conditionsTrees and shade
Trees and shade increase comfort and provide sun or rain protection for people walking, biking, rolling and waiting for transit. WSDOT is considering this improvement where gaps in the existing tree and shade cover along SR 7 have been identified.
Source: Paul Krueger/Wikimedia Commons, via Planetizen. Example of a greenery strip with trees providing shade along a sidewalkSignal timing modifications
Changing how traffic signals are timed can help reduce speeds and conflicts and increase comfort for corridor users. Changes to how traffic lights are coordinated along the corridor can reduce the opportunity for drivers to exceed the speed limit. Providing people walking and rolling a few extra seconds to enter a crosswalk before vehicles get a green light can help drivers see them before turning. Protected left-turn phases can reduce the potential for fatal and serious injury crashes and provide more protection for people walking and rolling in crosswalks.
Source: Los Angeles Walks Example of a pedestrian countdown signalAccess management
Access management limits some driveways and side streets with stop signs to right turns only. This reduces conflicts caused by vehicles turning left across traffic. This improvement is often paired with medians but can also be used without them.
Example of access management at J Street and South 10th Street in TacomaProject background
What is happening on SR 7 between SR 507 and 99th Street South?
This section of SR 7 between SR 507 and 99th Street South is due for repaving as part of the WSDOT preservation program. A new roadway surface helps keep roads in good condition and reduces the frequency of emergency repairs. In addition to paving, WSDOT is also looking at ways to reduce fatal and serious injury crashes and make travel more comfortable for all users of SR 7.
The pre-design must meet the requirements of Complete Streets and the Healthy Environment for All (HEAL) Act.
Complete Streets is an approach to planning, designing, building, operating and maintaining transportation systems so people of all ages and abilities can safely and conveniently access destinations. In Washington, Complete Streets requirements apply to WSDOT projects based on cost thresholds established by the Legislature in 2022.
The HEAL Act builds on WSDOT’s commitment to environmental justice. It focuses on the fair treatment and meaningful involvement of all people, regardless of race, color, national origin or income, in decisions that affect their environment and health. It also works to reduce harm and improve conditions for communities that are more affected by environmental disparities.
What does “pre-design” mean?
Pre-design is an early step in planning a project. WSDOT studies the area, gathers information and talks with community members and agency partners to identify improvements before full engineering design starts.
The pre-design step helps WSDOT better understand opportunities to improve:
- Safety concerns
- Traffic needs
- Americans with Disabilities Act needs
- Walking, biking and rolling challenges
- People and goods movement
- Transit service challenges
- Community values and priorities
Community feedback during the pre-design phase will help refine transportation improvements that will move forward into final design. The total cost will be determined once the design is complete.
Timeline

Partner and community engagement
WSDOT is working with a range of partners and community members throughout the pre-design process. This includes tribes, local agencies, transit providers, schools, emergency responders, community-based organizations (CBOs), businesses, and people who live, work, travel or visit the corridor.
WSDOT created the SR 7 Partner Group to help provide feedback throughout the project and to help inform the pre-design. The project team has also contacted more than 500 businesses along SR 7 and is planning additional opportunities for community members and partners to share their ideas. Our goal is to ensure everyone in the community has a voice in the development of this project.
This online open house and the in-person open house on Aug. 19, 2026, will help WSDOT gather feedback from community members to develop improvements that will better meet the needs of people who use and rely on SR 7.
Engagement to date
- 18 listening sessions with community members, CBOs and project partners in May
- Two SR 7 Partner Group meetings in June and July
- Outreach to businesses in the pre-design area
- Shared project information through summer tabling in Pierce County:
- Sprinker’s 50th Celebration
- Pierce County Trail Days
- Coordination with agencies, schools, businesses and community-based organizations (CBOs)