Skip to main content

US 97A rock removal open house

Open houses

Wednesday, August 14, 2019
Chelan City Hall
135 E. Johnson
Chelan, WA 98816
4 to 7 p.m.

Tuesday, August 20, 2019
Entiat Grange Hall
14108 Kinzel St
Entiat, WA 98822
4 to 7 p.m.

Workers on US 97A

What is the project?

Our plan is to remove loose rock at three locations along a section of US 97A. The first two locations are located between Entiat and the SR 971/Navarre Coulee Rd intersection from milepost 217.62 to 217.68 and milepost 219.80 to 219.90. The other location is between the SR 971/Navarre Coulee Rd intersection and Knapps Hill Tunnel at milepost 224.09 to 224.13.

What is the purpose of this open house?

We understand that this slope work will impact your commute so the purpose of this open house is to get input about your travel needs. This will help us to try to develop a work schedule that reduces the impact to you as much as possible.

When is WSDOT building this project?

Construction is currently planned for 2020.

Contact

Bob Romine, Project Engineer
WSDOT North Central Region
2830 Euclid Ave. Bldg A
Wenatchee, WA 98801
Phone: (509) 667-3038 or toll free (888) 461-8816
E-mail: RomineR@wsdot.wa.gov

Visit the project website