Skip to main content

US 101 paving improvements – Near term phase

WSDOT has divided the improvements into near- and long-term phases. Improvements in the near-term phase will be constructed when US 101 is repaved. Projects in the long-term phase have no funding at this time.

There are 10 projects in the near-term phase. These improvements include roundabouts, repurposed shoulders, new crossings, and an extended median. Detailed information can be found in the handout below.

Map showing ten projects in the near-term phase

US 101 Near-term Improvements between Sequim and Port Angeles (PDF 4.2MB)