SR 510/Yelm Loop – New alignment phase 2 online open house – Intersection improvements

WSDOT is proposing the following improvements to roads along the SR 510/Yelm Loop alignment as part of the Phase 2 new alignment.

Cullens Road

  • The SR 510/Cullens Road will become a four-leg intersection and be the western starting point of Phase 2.
  • This intersection will have stop signs on Cullens Road and will be free flow for SR 510 traffic.
  • The shared use path will be extended on the south side of the road.
This image shows proposed improvements that will be made to the intersection of SR 510 and Cullens Road.

Crystal Springs Street

  • Crystal Springs Street will not have an intersection with the SR 510/Yelm Loop to maintain intersection spacing as discussed under Roadway access.
  • A cul-de-sac will be constructed on the north side of the SR 510/Yelm Loop.
  • On the south side, the intersection of Crystal SpringsStreet and View Drive Court will be converted to a three-leg intersection with no north leg.
  • Residential access will be maintained to Crystal Springs Street.
This image shows proposed improvements that will be made along Crystal Springs Street.

Rhoton Road

  • The SR 510/Rhoton Road will become a four-leg intersection.
  • This intersection will have stop signs on Rhoton Road and will be free flow for SR 510 traffic.  
  • The 90th Avenue connection to Rhoton Road will be cul-de-sac as a part of the SR 510/Rhoton Road intersection construction.
This image shows the proposed improvements that will be made to the intersection of SR 510 and Rhoton Road.

Canal Road (north crossing)  

  • Canal Road will not have an intersection with the SR 510/Yelm Loop to maintain intersection spacing as discussed under Roadway access.
  • Canal Road will be re-aligned to connect to Canal Court north of SR 510/Yelm Loop and re-aligned to connect with Thea Rose Drive south of SR 510/Yelm Loop.
  • Residential access will be maintained to Canal Road
This image shows the proposed improvements that will be made to the intersection of SR 510 and Canal Road (north crossing).

Wilkensen Road

  • The SR 510/Wilkensen Road will become a four-leg roundabout intersection.
  • South of the roundabout intersection, Wilkensen Road will be realigned to construct the roundabout.
this image shows the proposed improvements that will be made to the intersection of Wiklensen Road and SR 510.

Prairie Line Trail

  • Phase 2 will add a bicycle/pedestrian underpass at the Prairie Line Trail.
This image shows the proposed bicycle pedestrian underpass that will be added at the Prairie Line Trail.

Railway Road

  • Railway Road will not have an intersection with the SR 510/Yelm Loop to maintain intersection spacing as discussed under Roadway access.
  • Cul-de-sacs will be constructed on the east and west side of the SR 510/Yelm Loop.
  • Residential access will be maintained to Railway Road.
This image shows the proposed improvements that will be made to the intersection of SR 510 and Railway Road.

Flume Road

  • The SR 510/Flume Road will become a four-leg intersection.
  • This intersection will have stop signs on Flume Road and will be free flow for SR 510 traffic.
This image shows the proposed improvements that will be made at the intersection of SR 510 and Flume road.

Canal Road (south crossing)

  • Canal Road will not have an intersection with the SR 510/Yelm Loop to maintain intersection spacing as discussed under Roadway access.
  • Cul-de-sacs will be constructed on the east and west side of the SR 510/Yelm Loop.
  • Residential access will be maintained to Canal Road.
This image shows the proposed improvements that will be made to the intersection of SR 510 and Canal Road (south crossing).

103rd Avenue

  • The SR 510/103rd Avenue will become a four-leg roundabout intersection.
  • The road will be raised as a part of the roundabout construction.
  • The shared-use path along the south/west side of the corridor will transition to sidewalks and bike lanes on both side of the SR 510/Yelm Loop south of the intersection.
This image shows the proposed improvements that will be made at SR 510 and 103rd Avenue.

SR 510/507

  • The SR 510/SR 507 intersection will become a three-leg roundabout intersection.
  • Access control will be provided along SR 510 between SR 507 and 103rd Avenue by a raised center median.
  • Access control will also be provided to the east with a raised center median extending easterly past the Walmart driveway.
This image shows the proposed improvements that will be made at the SR 510/SR 507 intersection.