Segment #3

Segment 3: Bike and Pedestrian Facility Options

Segment #3 is from 76th Street Southwest to 6th Street. The surrounding area is residential with Olympic View Middle School and Mukilteo Elementary School to the east. SR 525 has sidewalk in some sections and one lane and shoulder in each direction. SR 525 begins descending the hill towards the Mukilteo waterfront with the addition of a ferry holding lane just north of Goat Trail Road.

Existing conditions

An image showing a cross-section of SR 525 from 76th Street Southwest to 6th Street showing current road conditions, with sidewalks on both sides and vegetation running alongside each sidewalk.
A cross section of SR 525 showing the current road conditions

Options under consideration

An image showing an example of a shared use path running parallel to SR 525, separated by a buffer with vegetation.
Option 1 shows a shared use path separated from SR 525 with a buffer
An image showing an example of separated bike lanes for each direction of travel. These lanes are separated by a raised traffic curb and have a buffer of vegetation separating the raised sidewalk from bike lane.
Option 2 shows separated bike lanes, and a sidewalk with a buffer of vegetation between the bike path and sidewalk.
An image showing an example of a separated two-way bile lane with a sidewalk running alongside it and a buffer of vegetation separating the bike lane from the roadway. There is a sidewalk on the opposite side of SR 525, which is separated from the roadway by a buffer of vegetation.
Option 3 shows a separated two-way bike lane with a buffer separating it from SR 525 and a sidewalk on both sides of the roadway.

🗣️ Let us know which options you’d like to see included!