Wadada SR 509/24th Ave South ilaa South 188th Street ee jidka deg dega ee cusuban
Soo dhawoow
WSDOT waxay bilaabaysaa dhismaha mashruuca Wadada Gobolka 509/24th Avenue South ilaa South 188th Street (wadada cusub ee Expressway) sannadka 2024. Mashruucan waa wajiga ugu dambeeya ee si buuxda loo maalgeliyey (Wejiga 2aad) ee Mashruuca Dhameystirka SR 509.
Sida loo ka qayb qaato
Boggan furan ee khadka tooska ah wuxuu bixiyaa macluumaad ku saabsan meelaha shaqada lagu qabanayo iyo jadwalada howlaha ugu waaweyn ee mashruuca. Fadlan booqo bogagga hoose si aad wax badan uga ogaato mashruuca kadibna weydiiso su’aalahaaga bogga Xiriir Joogto ah.
Waxaad ka qayb qaadan kartaa boggan furan online ilaa 25 Oktoobar 2024.
Mashruucan waa maxay?
Mashruuca Wadada SR 509/24th Avenue South ilaa South 188th Street ee wadada cusub ee expressway waa wajiga ugu dambeeya ee horumarinta Mashruuca Dhameystirka SR 509, kaasoo xiriirinaya SR 509 iyo I-5 ee SeaTac. Marka mashruucu dhammaado 2028, dadku waxay mari karaan aagga iyagoo aan ka gudbinaynin SR 518 iyo wadooyinka maxalliga ah markay u kala safraan I-5, Garoonka Diyaaradaha Sea-Tac, Dekedda Seattle iyo xaafadaha Koonfurta ee degmada King. Bulshadu waxay arki doontaa gawaarida xamuulka ah oo yaraada maxaa yeelay wadayaasha xamuulka waxay heli doonaan waddo cusub. Qaybta cusub ee SR 509 waxaa laga qaadi doonaa toll. Inta dhismuhu socdo iyo kadib dhameystirka, dadka wali way sii sii isticmaali karaan meelaha ay hadda ka galaan SR 509 iyo I-5, mana loo baahna inay toll ka bixiyaan wadooyinka hadda ay adeegsadaan.

Maxaa ku jira mashruuca?
Mashruuca Wadada SR 509/24th Avenue South ilaa South 188th Street expressway waxa uu ka kooban yahay:
- In ka badan labo mayl oo wado cusub ah.
- Meel kale oo lane ah oo I-5 ah xagga koonfureed inta u dhaxaysa SR 516 iyo South 272nd Street ee Kent.
- Roundabouts laga dhisayo South 160th Street ee Burien iyo South 188th Street ee SeaTac.
- Darbiyo cusub oo ka hortaga buuqa.
- Dib u soo celinta deegaanada dabiiciga ah ee ku dhex jira aagga mashruuca.
Jadwalka mashruuca
Hawlaha hore ee dhismaha waxaa ka mid ah jaridda dhirta ee aagga oo dhan. Shaqo culus waxay bilaaban doontaa dayrta 2024. Ka eeg goobo-shaqo ee bogagga xiga si aad u ogaato waxa kuu dhow, shaqada ama safarkaaga.

Mashruuca Dhameystirka SR 509 horeba waa la dhisayaa. Wejiga 1a waxa uu furmay 2022, wejiga 1b waxa la filayaa in lagu furo 2025, wejiga 2aadna waa la filayaa in la furo 2028.
Goobaha shaqada & jadwalka
Shaqaalaha dhismaha waxay ka shaqayn doonaan afar magaalo oo kala duwan: Burien, Des Moines, SeaTac, iyo Kent. Waxaan siinnay faahfaahin meel kasta oo dhismo si aad u ogaato waxa aad filan karto haddii aad safreyso ama degan tahay meelahaas.
Xulo xiriirada hoose si aad wax badan uga ogaato wararkii ugu danbeeyay ee dhismaha goobtaas.
- Waxaan ku noolahay, ka shaqeeyaa, ama ku safraa Burien.
- Waxaan ku noolahay, ka shaqeeyaa, ama ku safraa Des Moines, SeaTac, iyo koonfurta Burien.
- Waxaan ku noolahay, ka shaqeeyo, ama ku safraa aagga Barnes Creek.
- Waxaan ku noolahay, ka shaqeeyaa, ama ku safraa Kent.
Waxaan ku noolahay, ka shaqeeyaa, ama ku safraa Burien
South 160th Street
Si loo waafajiyo isbadalada saadaasha taraafikada loona wanaajiyo badqabka, WSDOT waxay dib u dhisi doontaa isgoyska SR 509/South 160th Street iyadoo lagu darayo wareegyada (roundabouts).
Naqshadda isgoyska SR 509/South 160th StreetHaddii aad ku nool tahay, ka shaqeysaa, ama ku safarto isgoyska SR 509/South 160th Street, fil duufaan, boodh, iyo isbadal ku yimaada habka gaadiidka ee ku saleysan dhismaha wadooyinka.
Shaqada isgoyska SR 509/South 160th Street waxay bilaabatay xagaaga 2024, waxaana laga bilaabay shaqooyinka biyo-mareenka. Waxqabadka halkaas wuxuu keeni doonaa xirnaansho usbuuca dhamaadkiisa ee South 160th Street. Warar dheeraad ah ayaa la sii deyey marka taariikhaha la go'aamiyo. Helitaanka ganacsiyada iyo guryaha waa la sii hubinayaa.
Wareegyada
Daraasado ayaa muujiyay in wareegyada ay ka ammaan badan yihiin isgoysyada caadiga ah ee leh calaamadda joogsi ama nalalka taraafikada. Si aad wax badan ugu barato sida loogu safro wareegyada sida lugayn, baaskiil, ama darawal, fiiri bogga badqabka taraafikada wareegyada ee WSDOT.
Darbiyada buuqa
Hal darbiga buuq ayaa laga dhisi doonaa koonfur-galbeed ee isgoyska SR 509/South 160th Street oo ku dheggan wadada horay looga baxayo ee SR 509. Darbiga labaad waxaa laga dhisi doonaa waqooyi-bari ee isgoysyada iyadoo u dhaxaysa Fourth Avenue South iyo wadooyinka SR 509 waqooyi u socda.
Naqshadda isgoyska South 160th Street/SR 509 Haddii aad si dhow ugu dhowdahay mid ka mid ah darbiyada buuqa ee qorshaysan agagaarka isgoyska SR 509/South 160th Street, fil kooxaha soohdinta inay kula soo xiriiraan ka hor inta aan la bilaabin dhismaha. Inta lagu jiro dhismaha, shaqaalaha waxay adeegsan doonaan mishiinada si ay u qodaan aasaaska darbiyada, u cadaadiyaan carrada, ugu shubaan shubka aasaaska darbiga, una dhigaan paneelada cusub ee lafta ah. Dhismaha darbiyada buuqa waxaa la filayaa inuu socdo lix ilaa sagaal bilood iyadoo goobta laga cabirayo.
Darbiga buuqa ee kooxdu ka dhigtay wajiga 1b ee mashruuca dhameystirka SR 509 Qandaraaslayaashu waa inay ilaaliyaan xeerarka buuqa ee deegaanka waxayna qaadi doonaan tillaabooyin lagu yareynayo buuqa iyo hawsha dhismaha ee dhibi karta dadka iyo ganacsiga. Hababka ugu fiican ee maaraynta buuqa iyo shaqada dhismaha ku dhow dadka deriska iyo ganacsiyada waxaa ka mid ah:
- In deganayaasha ku dhow la siiyo ogeysiis hore oo ku saabsan shaqada dhawaqa leh ee habeenkii.
- In la qoyeyo dhulka si boodhka loo yareeyo.
- In la safaydo fureyaasha gaariyada si loo xakameeyo dhawaqa iyo si looga hortago marooryaqaanta gaariyada.
Su'aalo ama walaac?
Haddii aad qabto su'aalo ama walaac ku saabsan dhismaha wakhti kasta, waxaad naga soo xiriiri kartaa khadka tooska ah 24ka saacadood, 206-225-0674, ama SR509Construction@wsdot.wa.gov.
I live in, work in, or travel through Des Moines, SeaTac, and southern Burien
Des Moines Memorial Drive/South 188th Street
The new SR 509/South 188th Street interchange will now have access to all directions of travel. To accommodate this change in traffic patterns and improve safety, WSDOT will rebuild the interchange by adding roundabouts. For southbound SR 509 traffic, the SR 509/South 188th Street interchange will be the last exit before continuing onto the tolled section of the expressway.

Crews expect to begin construction in this area as soon as summer 2025, starting with temporary ramps to create the new work zones. If you live near, work near, or travel through the SR 509/South 188th Street interchange, expect the noise, dust, and traffic pattern changes typically associated with road construction. Local access to businesses will be maintained.
New SR 509 Expressway
The new SR 509 Expressway will continue south from the SR 509/South 188th Street interchange, passing over the Lake to Sound Trail, under South 192nd Street, over Des Moines Memorial Drive, and over South 200th Street and Des Moines Creek Park before connecting with the new section of the SR 509 Expressway near 24th Avenue South.
If you use the Lake to Sound Trail: The trail will remain mostly open during construction. Crews may close the trail to set bridge girders or allow construction equipment to cross the trail. In these instances, there will be flaggers and traffic control measures to direct trail users. Expect noise typically associated with construction and heavy machinery.
If you use South 192nd Street: The road will close to all traffic for approximately nine months, starting as soon as 2025, while crews build a new South 192nd Street bridge that the future SR 509 Expressway will cross under. We’ll share more information about when community members can expect this closure once we have a final South 192nd Street bridge construction schedule.
If you use South 194th Street: The South 194th Street connection to Des Moines Memorial Drive will close permanently. This permanent closure will happen shortly after South 192nd Street closes.
If you live near South 194th Street: The new SR 509 Expressway will pass through this area. Most work will occur during the day, and some nighttime construction activities will be scheduled as needed. Expect some daytime noise and dust typically associated with heavy construction.

If you use Des Moines Memorial Drive, between South 200th Street and South 192nd Street: Some nighttime closures will be scheduled to set bridge girders and perform other construction activities.

If you use the Des Moines Creek Trail: The trail will remain open during construction. Crews may close the trail to set bridge girders or allow construction equipment to cross the trail. In these instances, there will be flaggers and traffic control measures to direct trail users. Expect noise typically associated with construction and heavy machinery
If you use South 200th Street: South 200th Street will remain open during the day throughout construction and will not be rerouted. Frequent nighttime closures will be scheduled to build the elevated expressway.

You can learn more about what WSDOT has planned at each of these locations by visiting the SR 509 Expressway interactive map.
Contractors are required to meet local noise variances and will take steps to minimize noise and potentially disruptive construction activity. Best practices for managing noise and construction near neighbors and businesses include:
- Providing nearby residents with notices in advance of noisy nighttime work.
- Wetting down the ground to prevent dust.
- Lining truck beds to help dump material and limit tailgate slamming.
Questions or concerns?
If you have questions or concerns about construction at any time, you can always contact our team at our 24-hour hotline, 206-225-0674, or SR509Construction@wsdot.wa.gov.
I live in, work near, or travel through the Barnes Creek area
Barnes Creek wetland mitigation
A large wetland improvement project is planned at Barnes Creek in Des Moines. The area extends from Kent-Des Moines Road to South 220th Street. The Barnes Creek restoration site enhances habitat for plants native to the region.

If you use the Barnes Creek Nature Trail, expect the trail to close periodically while crews work in the area. Crews will post signs ahead of trail closures.
If you live near the Barnes Creek mitigation site, expect some noise from construction machinery during daytime construction hours. Most work will be performed with hand tools and small construction machines.
Contractors are required to meet local noise variances and will take steps to minimize noise and potentially disruptive construction activity. Best practices for managing noise and construction near neighbors and businesses include:
- Providing nearby residents with notices in advance of noisy nighttime work
- Wetting down the ground to prevent dust
- Lining truck beds to help dump material and limit tailgate slamming
Questions or concerns?
If you have questions or concerns about construction at any time, you can always contact our team at our 24-hour hotline, 206-225-0674, or SR509Construction@wsdot.wa.gov.
What’s not included in Stage 2?
Stage 1a
The first stage of the SR 509 Completion Project built a new SR 99 bridge in SeaTac below the Link light rail elevated guideway and above the SR 509 roadway. The SR 99 bridge opened to traffic in July 2022.
Stage 1b
This stage of the SR 509 Completion Project, which is currently in progress, builds the first mile of new tolled expressway between I-5 and 24th Avenue South, new I-5 ramps, new interchanges, a tunnel under I-5 and a new South 216th Street bridge. Project photos and visualizations are available on our Flickr page and the SR 509 Expressway interactive map.

What is the Puget Sound Gateway Program?
The Puget Sound Gateway Program includes the SR 509 Completion Project in south King County and the SR 167 Completion Project in Pierce County. Together, these improvements will enhance the state’s economic competitiveness, both nationally and globally, connecting the state’s largest ports to key distribution centers in King and Pierce counties.
